Welcome to SmBom Tesco!
All Products
Request for Quotation
Warm Tips:Please fill out the below form and we will contact you as soon as possible
default_pic
Image shown is a representation only.

G10N10A

N100V,RD(MAX)<20M@10V,RD(MAX)<22
Smyg No:SM-1120-3622372
Mfr Number:G10N10A
Manufacturer:GOFORD
Category:MOSFETs
Data sheet: G10N10A-Datasheet-3622372.pdf
Product Details
Data Sheet
Guarantees
Shipping
|Product details
Found similar products: 17211
Product AttributeAttribute Value
Product StatusActive
FET TypeN-Channel
TechnologyMOSFET (Metal Oxide)
Drain to Source Voltage (Vdss)100 V
Current - Continuous Drain (Id) @ 25°C10A (Ta)
Drive Voltage (Max Rds On, Min Rds On)4.5V, 10V
Rds On (Max) @ Id, Vgs20mOhm @ 10A, 10V
Vgs(th) (Max) @ Id1.6V @ 250µA
Gate Charge (Qg) (Max) @ Vgs90 nC @ 10 V
Vgs (Max)±20V
Input Capacitance (Ciss) (Max) @ Vds2600 pF @ 50 V
FET Feature-
Power Dissipation (Max)3.1W (Ta)
Operating Temperature-55°C ~ 150°C (TJ)
Mounting TypeSurface Mount
Supplier Device Package8-SOP
Package / Case8-SOIC (0.154", 3.90mm Width)
Frequently Asked Questions

| Are the G10N10A price and stock displayed on the platform accurate?
G10N10A inventory fluctuates greatly and cannot be updated in time, it will be updated periodically within 24 hours. After submitting the order, it is recommended to confirm the order with SmBom salesperson or online customer service before payment.
| What if I don't get business or technical support in time?
Depending on the time difference between your location and our location, it may take several hours for us to reply, please be patient, Our technical engineers will help you with G10N10A pinout information, replacements, datasheets in pdf, programming tools, starter kits and more.
| What are the specific procedures for delivery?
Once payment has been confirmed and received you will see that the order status will change to "wait for delivery". We will then reach out to you and directly to arrange the delivery, requesting delivery address, contact details and updating you on the delivery timeline. Once delivery has been setup the status will be adjusted to "wait for the receipt".