Part #/ Keyword
All Products
Image shown is a representation only.

FN9262B-10-06

PWR ENT MOD RCPT
FN9262B-10-06
Schaffner EMC, Inc.
Quantity
Unit Price:$ 34.325
Total Price:$
QuantityUnit Price
1 +$ 34.325
10 +$ 31.4975
25 +$ 30.2858
60 +$ 29.276335
120 +$ 27.661085
Not the price you want? Send RFQ Now and we'll contact you ASAP. Inquire for More Quantity
Product Details
Data Sheet
Guarantees
Shipping
Product AttributeAttribute Value
Product StatusActive
Connector StyleIEC 320-C14
Connector TypeReceptacle, Male Blades - Module
Current - IEC-
Voltage - IEC-
Current - UL10A
Voltage - UL250VAC
Filter TypeFiltered (EMI, RFI) - Commercial, Medical
Accomodates a FuseYes (Fuse Not Included)
Number of Positions3
Mounting TypePanel Mount, Flange
TerminationQuick Connect - 0.250" (6.3mm)
Switch Features-
Features-
Fuse Holder, DrawerFuse Holder, Twin Fused
Panel Cutout DimensionsRectangular - 29.00mm x 33.00mm
Panel Thickness-
Material Flammability RatingUL94 V-0
Ingress ProtectionIP40
Approval AgencyCE, CQC, CSA, ENEC, UL
Frequently Asked Questions
| Are the FN9262B-10-06 price and stock displayed on the platform accurate?
FN9262B-10-06 inventory fluctuates greatly and cannot be updated in time, it will be updated periodically within 24 hours. After submitting the order, it is recommended to confirm the order with smbom salesperson or online customer service before payment.
| What if I don't get business or technical support in time?
Depending on the time difference between your location and our location, it may take several hours for us to reply, please be patient, Our technical engineers will help you with FN9262B-10-06 pinout information, replacements, datasheets in pdf, programming tools, starter kits and more.
| What are the specific procedures for delivery?
Once payment has been confirmed and received you will see that the order status will change to "wait for delivery". We will then reach out to you and directly to arrange the delivery, requesting delivery address, contact details and updating you on the delivery timeline. Once delivery has been setup the status will be adjusted to "wait for the receipt".