Part #/ Keyword
All Products
Image shown is a representation only.

FN9289-6-100

PWR ENT MOD RCPT IEC320-C14 PNL
FN9289-6-100
Schaffner EMC, Inc.
Quantity
Unit Price:$ 18.26
Total Price:$
QuantityUnit Price
1 +$ 18.26
10 +$ 15.9895
25 +$ 15.2984
50 +$ 14.805
100 +$ 14.3115
250 +$ 13.5219
Not the price you want? Send RFQ Now and we'll contact you ASAP. Inquire for More Quantity
Product Details
Data Sheet
Guarantees
Shipping
Product AttributeAttribute Value
Product StatusActive
Connector StyleIEC 320-C14
Connector TypeReceptacle, Male Blades - Module
Current - IEC-
Voltage - IEC-
Current - UL6A
Voltage - UL250VAC
Filter TypeFiltered (EMI, RFI) - Commercial
Accomodates a FuseYes (Fuse Not Included)
Number of Positions3
Mounting TypePanel Mount, Snap-In
TerminationSpring-Cage
Switch FeaturesSwitch On-Off
Features-
Fuse Holder, DrawerFuse Holder, Twin Fused
Panel Cutout DimensionsRectangular - 28.80mm x 47.10mm
Panel Thickness0.039" ~ 0.098" (1.00mm ~ 2.50mm)
Material Flammability RatingUL94 V-2
Ingress ProtectionIP40
Approval AgencyCQC, CSA, ENEC, UL
Frequently Asked Questions
| Are the FN9289-6-100 price and stock displayed on the platform accurate?
FN9289-6-100 inventory fluctuates greatly and cannot be updated in time, it will be updated periodically within 24 hours. After submitting the order, it is recommended to confirm the order with smbom salesperson or online customer service before payment.
| What if I don't get business or technical support in time?
Depending on the time difference between your location and our location, it may take several hours for us to reply, please be patient, Our technical engineers will help you with FN9289-6-100 pinout information, replacements, datasheets in pdf, programming tools, starter kits and more.
| What are the specific procedures for delivery?
Once payment has been confirmed and received you will see that the order status will change to "wait for delivery". We will then reach out to you and directly to arrange the delivery, requesting delivery address, contact details and updating you on the delivery timeline. Once delivery has been setup the status will be adjusted to "wait for the receipt".